Dear TechNet-21 communty,

I would like share with you some pictures of the installation process of 37 SDD that we are doing in Colombia.

Best regards.

Attachments (7)
Terry Hart Accepted Answer
0
Votes
Undo

Dear Rafal and SKAT/HEAT colleagues.

Good to see this equipment finally installed. Congratulations.  I must admit that I have not seen a makeshift wooden support structure similar to this since Mr Ramsbottom a certain Swiss entrepreneur attempted a similar exercise in Ghana. Regret that one of the array mounting scenarios proposed in the training manual could not be adopted, especially the pole mount.  Let us hope these wooden unbraced frames  will be a little more relaible than those in Ghana.  As for the instrument images, little to comment except perhaps the tilt is set at 15 Deg and possibly North, at a latutude of 5N. Hopefully not.  Assume the VDC reading is Voc of the array and not Vno with the compressor running.  If you are really limited to wooden support structures, please let me send you some images of wooden array support structures in Fiji. 

Best,

Terry